Ir directamente a la información del producto
1 de 1

Lulu.Com

Design Considerations For Space Elevator Tether Climbers

Design Considerations For Space Elevator Tether Climbers

ISBN-13: 9781312099821
Precio habitual $16.18
Precio habitual Precio de oferta $16.18
Oferta Agotado
Los gastos de envío se calculan en la pantalla de pago.
The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions: - The study used the concept of "constant power" as a baseline because of its ability to lower design requirements on the tether climber. - The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously. - The communication architecture should be integrated into the space elevator infrastructure and nodal layout. - Solar power, as the sole source, appears achievable. - The use of laser power as the sole source also seems achievable. 9781312099821 1312099828 93 Technology & Engineering NOT_MATURE http://books.google.com/books/content?id=5l3UDgAAQBAJ&printsec=frontcover&img=1&zoom=5&edge=curl&source=gbs_api en


  • Author: Cathy Swan, Peter Swan, Robert "Skip" Penny, John Knapman, Peter Glaskowsky Lulu.com 2014-04 The subject selected for this 2013 study is the Space Elevator Tether Climber. The objective of the one year study was to survey current concepts and technologies related to tether climbers, identify critical issues, questions, and concerns, assess their impact on the development of space elevators, and project towards the future. The following are a few of the conclusions: - The study used the concept of "constant power" as a baseline because of its ability to lower design requirements on the tether climber. - The mass breakout of 6 MT for a climber and 14 MT for customer payloads seems feasible. The estimate is that with a travel time of one week to GEO seven tether climbers can be on a tether simultaneously. - The communication architecture should be integrated into the space elevator infrastructure and nodal layout. - Solar power, as the sole source, appears achievable. - The use of laser power as the sole source also seems achievable. 9781312099821 1312099828 93 Technology & Engineering NOT_MATURE http://books.google.com/books/content?id=5l3UDgAAQBAJ&printsec=frontcover&img=1&zoom=5&edge=curl&source=gbs_api en
  • Publisher: Lulu.Com
  • Publication Date: Apr 13, 2014
  • Number of Pages: 92 pages
  • Language: English
  • Binding: Paperback
  • ISBN-10: 1312099828
  • ISBN-13: 9781312099821
Ver todos los detalles